Harrismith Culvert
Project of the Month
PERI supplied Raubex Construction a custom made formwork solution – allowing the construction of both the slabs and walls in one cast. Eight units of 2.5m each was used to form the 110m long culvert in 10 metre sections. The custom made traveler used VARIO, MRK frames, Multiprops and walers and allowed the formwork to be moved as a unit.
Twitter
LinkedIn