The Project
Impressions from the project process
Project Information
![Alexey Boldyirew, Deputy Construction Manager | Sergey Haladji, Foreman](https://cdn.peri.cloud/.imaging/xlWide/dam/a79577e5-e80b-42bc-9cb1-8c794fbdade8/81558/alexey-boldyirew-deputy-construction-manager-and-sergey-haladji-foreman.jpg)
![Alexey Boldyirew, Deputy Construction Manager and Sergey Haladji, Foreman Alexey Boldyirew, Deputy Construction Manager | Sergey Haladji, Foreman](https://cdn.peri.cloud/.imaging/xlWide/dam/a79577e5-e80b-42bc-9cb1-8c794fbdade8/81558/alexey-boldyirew-deputy-construction-manager-and-sergey-haladji-foreman.jpg)
Alexey Boldyirew | Sergey Haladji
Deputy Construction Manager | Foreman
At the beginning, we were rather sceptical concerning the filigree structure. Our trust has been growing by the day – now we are absolutely thrilled. The PERI formwork carriage is extremely stable and very suitable for our daily work, it fulfils all requirements of our jobsite.
Are you working on a project like this?
Call us on +27 (0)21 880 7777 to discuss your requirements further.
![Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.](https://cdn.peri.cloud/.imaging/mWide/dam/0b931b70-a78c-4428-b62d-b9450ad627d6/81563/bypass-tunnel-sochi-for-construction-of-the-emergency-parking-bays-the-formwork-carriage-was-designed-with-a-width-of-14-30-m.jpg)
![Bypass tunnel Sochi - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.](https://cdn.peri.cloud/.imaging/mWide/dam/0b931b70-a78c-4428-b62d-b9450ad627d6/81563/bypass-tunnel-sochi-for-construction-of-the-emergency-parking-bays-the-formwork-carriage-was-designed-with-a-width-of-14-30-m.jpg)