Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.

Bypass tunnel Sochi, Russian Federation
Sochi, Russia

  • length tunnel: 2.6 km
  • width/height of cross-section: 10.80 m / 7.95 m
  • structure: mining technique


OOO Tonneldorstroy, Sochi

Location
Main Application
Civil Engineering

The Project

Impressions from the project process

Project Information

Alexey Boldyirew, Deputy Construction Manager | Sergey Haladji, Foreman
Alexey Boldyirew, Deputy Construction Manager | Sergey Haladji, Foreman
Alexey Boldyirew | Sergey Haladji
Deputy Construction Manager | Foreman
At the beginning, we were rather sceptical concerning the filigree structure. Our trust has been growing by the day – now we are absolutely thrilled. The PERI formwork carriage is extremely stable and very suitable for our daily work, it fulfils all requirements of our jobsite.

Related Products

##salesContact.expertImageAltLabel## Are you working on a project like this?

Call us on +27 (0)21 880 7777 to discuss your requirements further.
Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.
Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.