Chachenka Motorway Bridge, Russian Federation
Moscow,
Russia
Design: Motorway Bridge
Lenght: 550m
Contractor
«SGC Autostrada»
Field Service
PERI Russia, Noginsk/Moscow, PERI Poland Sp. z o.o., Warsaw
Location
Main Application
Civil Engineering
The Project
Impressions from the project process
The 22.25 m wide superstructure sections were constructed with section lengths ranging from 3.40 m to 4.10 m in regular 10-day cycles.
For safe working platforms and access, VARIOKIT and PERI UP could be ideally combined.
The VARIOKIT cantilever construction solution could be flexibly adapted to meet the individual project requirements.
Apart from the VARIOKIT balanced cantilever equipment, the CB/VARIO climbing formwork was also an important part of the PERI project solution.
The 22.25 m wide superstructure sections were constructed with section lengths ranging from 3.40 m to 4.10 m in regular 10-day cycles.
For safe working platforms and access, VARIOKIT and PERI UP could be ideally combined.
The VARIOKIT cantilever construction solution could be flexibly adapted to meet the individual project requirements.
Apart from the VARIOKIT balanced cantilever equipment, the CB/VARIO climbing formwork was also an important part of the PERI project solution.
Project Information
Konnyh Aleksandr Andreevich | Zamaletdinov Fatih Nailovich
Head of Production and Engineering | Site Manager
With the VARIOKIT cantilevered construction carriage from PERI, we could safely realize the superstructure sections as well as in the planned working rhythm. On-site assembly also took place in a very short time.