Site Progress
At its peak, over 130 tons of PERI equipment were on site—including approximately 1 400 m² of MULTIFLEX and PD5, together with 300 m² of Handset Alpha. These systems supported a single large slab pour across the facility, with walls reaching 3 m in height and the slab rising to 5.2 m.
-
PD 5 on site
PD5 was chosen over Quickstage due to faster turnaround times, extended height capability, and reduced material requirements on site.
-
Polyoaks Packaging
Early-stage construction at the Polyoak Packaging site — HANDSET Alpha in use for the first lift of the lift shaft, with excavation and foundation work progressing across the footprint.
-
Polyoaks Packaging
Aerial view of the Polyoak Packaging site in Pinetown, showcasing slab and beam construction in progress with PERI systems in action — including PD 5 towers supporting double-volume heights and Multiflex decked across the structur