Refuse Derived Heating and Power Station, Germany
Spremberg,
Germany
50-m-high power station complex in the “Schwarze Pumpe” industrial park.
Glass Ingenieurbau Leipzig GmbH
Location
Main Application
Industrial Structures
The Project
Impressions from the project process
The VARIOKIT heavy-duty shoring towers with a height of 23.60 m can support loads of over 200 t in each case. The horizontal assembly of the approx. 10 m high tower sections makes the erection of the shoring easy and safe.
Massive concrete components characterize the heating and power plant in Spremberg. Further challenges for the realization of the giant complex were the large heights and high loads.
The heavy-duty shoring tower and the project-specific bracket solution were based on rentable system components of the VARIOKIT engineering construction kit. The combination with integrable PERI UP working platforms in the head area provided a very high level of safety also at great heights.
Safe and fast access to all working areas for heights of up to 60 m - absolutely no problem with PERI UP stairs. The 75 cm wide stairways were quickly assembled.
The CB 240 climbing scaffold, combined with VARIO GT 24 girder wall formwork, was used for constructing the massive power plant walls. Due to the walls tapering in an upward direction, the wall thickness was reduced by 10 cm per climbing cycle.
The VARIOKIT heavy-duty shoring towers with a height of 23.60 m can support loads of over 200 t in each case. The horizontal assembly of the approx. 10 m high tower sections makes the erection of the shoring easy and safe.
Massive concrete components characterize the heating and power plant in Spremberg. Further challenges for the realization of the giant complex were the large heights and high loads.
The heavy-duty shoring tower and the project-specific bracket solution were based on rentable system components of the VARIOKIT engineering construction kit. The combination with integrable PERI UP working platforms in the head area provided a very high level of safety also at great heights.
Safe and fast access to all working areas for heights of up to 60 m - absolutely no problem with PERI UP stairs. The 75 cm wide stairways were quickly assembled.
The CB 240 climbing scaffold, combined with VARIO GT 24 girder wall formwork, was used for constructing the massive power plant walls. Due to the walls tapering in an upward direction, the wall thickness was reduced by 10 cm per climbing cycle.
Project Information
Hanno Pradel | Klaus-Dietrich Koch
Site Manager | Site Foreman
The technical support from PERI is very competent and professional – and tailored to our construction site requirements. We chose the PERI UP scaffolding because it has universal application and can also be moved by crane in large units. With the VARIOKIT heavy duty tower we liked the simple and time-saving assembly using system parts and connections. Additionally, the towers could be pre-assembled on their sides and then lifted into position by the crane. The supporting system can be combined with PERI UP in differing ways in terms of working and protective scaffolding.
Are you working on a project like this?
Call us on +27 (0)21 880 7777 to discuss your requirements further.